Supply of I.B.R. Certified boiler operator for operation of boiler
| Checking of operation of mob ray controllers |
| Checking of functioning of injector if any. |
| Checking of water pump discharge line recirculation line and pressure reducing. |
| Checking of operation of pressure switches. |
| Checking of high stack temperature cut off switch if any. |
| Replacement off gas kits if necessary. |
| Cleaning of gauge glasses. |
| Checking of all strainers in water circuit 3 -Maintenance of feed water pumps. |
| Cleaning of I.D. fan. Damper |
| Lubrication of all bearings and gearbox assembly. |
| Checking of operation of steam safety valves |
| 1 -Tightening / Replacement of pump glands incase of any leakage. |
| 2 -Any other as per manufacturer instruction. |